Main Page / Solutions / Heavy Machinery

Heavy Machinery

Another skill of Volga-Dnepr is transportation of cumbersome mining equipment, manufacturing lines and heavy machines, trucks and diggers.

Such logistics projects require the carrier to combine previous experience of such shipments with specialist knowledge and extensive engineering and technical capabilities.

To assist customers, Volga-Dnepr conducts ‘virtual’ planning and prepares an individual solution for safe loading/discharging of the cargo. This also ensures the oversized equipment can be carried to its delivery point without delay.

November 2010

Volga-Dnepr transported from Prestwick (Scotland) to Ulan-Bator (Mongolia) two mining facilities weighing 80 tons. Volga-Dnepr’s Engineering and Logistics Center developed a door-to-door delivery scheme to ensure the success of this project.

March 2009

Volga-Dnepr transported tunnel mining equipment to Sochi to be used in the development of infrastructure facilities for the 2014 Winter Olympic Games being hosted in the Russian city. An oversized cargo weighing 94 tonnes was delivered from Novosibirsk to Adler Airport onboard the Antonov-124-100 flight.